Sheffield Project
Project Overview
Client Requirements
 The client sought a complete renewal of the ageing asbestos fibre roof, improved insulation performance, and enhanced natural lighting. Additionally, the rainwater system required upgrading to a long‑life, low‑maintenance solution.
Key Objectives Include
Scope of Work
Safe Removal of Existing Roof Materials
- Complete removal of asbestos fibre roof sheets
- Removal of existing asbestos gutters
- All removal works carried out under strict safety and environmental controls
Installation of New Roofing System
TATA Trisomet 333 120mm Composite Roof Panels: Delivering excellent thermal performance and long-term durability.
Filon Fairs GRP Rooflights:Â Â Installed to maximise natural daylight and reduce energy consumption.
Â
Drainage & Gutter Upgrades
40mm insulated membrane‑lined gutters: Improving thermal performance and water management.
HD Sharmans gutter coating system: Providing an additional layer of protection and extending the lifespan of the drainage system.
Â
150mm PVCu rainwater goods:Â Low-maintenance, impact-resistant, and designed for long-term reliability.
Â
Challenges and Solutions
Working with asbestos requires rigorous control measures.Our trained, accredited team carried out all works to the highest compliance standards, ensuring complete safety for both site personnel and the client.
The client required minimal disruption to ongoing activities, therefore we had to ensure work was phased and co-ordinated efficiently, ensuring smooth progress with limited downtime.
Project Outcome
Conclusion
Quality Assurance & Warranties
Covering the durability and performance of the roof materials.
Ensuring the installation meets high professional standards and giving the client peace of mind.